RoDTEP rate for HS code 73029090: Railway or tramway track construction material of iron or steel, other

Appendix 4R gives 7302 90 90, the residual “Other” line under railway or tramway track construction material of iron or steel, 1.5% of FOB value, capped at ₹2 per Kg.

RoDTEP, HS 730290907302 90 90Cap ₹2 per Kg
4RDTA1.5% of FOB, capped at ₹2 per Kg
₹10,00,000 FOBby the rate, before the cap₹15,000
Set byNotification 32/2024-25
4REAA, EOU, SEZ0.9% of FOB
UQCKg
RoDTEP rate, Appendix 4R1.5%
DGFT Notification 41/2026-27: to 31 December 2026, rates as on 30 September 2026.Your shipment

RoDTEP rate for HS code 73029090, worked

1.5% of ₹10,00,000 is ₹15,000, but ₹2 per Kg binds below 7,500 Kg, which is 7302 90 90 invoiced above ₹133.33 per Kg FOB.

Cap on 5,000 Kgthis one binds₹2 x 5,000₹10,000
Rate on ₹10,00,000not binding1.5%₹15,000

So 5,000 Kg of 7302 90 90 at ₹10,00,000 earns ₹10,000, or ₹9,000 under 4RE. An illustration, not advice.

Heading 7302 around HS code 73029090

Appendix 4R rates all 11 items under 7302 at 1.5%, 11 capped. Chapter 73 as a whole: all 250 rated, 0.5% to 1.5%. Duty is 15% on all 11 under 7302.

CodeDescriptionExport rateCapDuty
7302 10 11Head hardened rails1.5%₹1 per Kg15%
7302 10 12Asymmetric rails with end forging1.5%₹1 per Kg15%
7302 10 13Asymmetric rails without end forging1.5%₹1 per Kg15%
7302 10 14Other than asymmetric rails and head hardened rails1.5%₹1 per Kg15%
7302 10 19Other1.5%₹1 per Kg15%
7302 10 20For tramways1.5%₹1 per Kg15%
7302 10 90Other1.5%₹1 per Kg15%
7302 30 00Switch blades, crossing frogs, point rods and other crossing pieces1.5%₹1.4 per Kg15%
7302 40 00Fish-plates and sole plates1.5%₹3.6 per Kg15%
7302 90 10Material for jointing or fixing rails1.5%₹3.6 per Kg15%

Where 7302 90 90 sits in the schedule

LevelDescription
73Articles of iron or steel
7302Railway or tramway track construction material of iron or steel, the following: rails
7302 90Other
7302 90 90Other (kg.)

Import duty on HS code 73029090

7302 90 90 at its First Schedule rate, no exemption applied; IGST per CBIC 045/2025, I229. How these are checked.

RateLevyAmount
15%Basic customs duty₹1,50,000
10%Social Welfare Surcharge₹15,000
18%IGST₹2,09,700
37.47%Total₹3,74,700
₹1,50,000Payable with a duty-credit scripPlus ₹2,24,700 in cash. Scrip trading

Preferential rates on 7302 90 90

0% for ASEAN countries takes ₹3,74,700 to ₹1,80,000, 2025 schedule.

ASEAN countries, Australia, Japan, Least Developed Countries, Malaysia, Nepal, Philippines, SAFTA (LDC) countries, Sri Lanka, the republic of Korea0%
SAFTA countries5%
United Arab Emirats6.5%

Sources: Appendix 4R and 4RE, DGFT Notification 32/2024-25 as amended to 15/2026-27; the First Schedule to the Customs Tariff Act, 1975. Not an assessment or classification advice.

How RoDTEP rates are calculated7302 90 90 in the RoDTEP calculatorHow the import bill is built

For exporters

Your scrip is worth cash the day it lands.

Offers firm for 60 seconds. Settlement the same business day.