RoDTEP rate for HS code 98010014: For mining project
Appendix 4R gives 9801 00 14, for mining project, 0.5% of FOB value, uncapped.
Appendix 4R gives 9801 00 14, for mining project, 0.5% of FOB value, uncapped.
Appendix 4R rates all 8 items under 9801 at 0.5%. Chapter 98 as a whole: 8 of 15 rated. Duty is 7.5% on all 8 under 9801.
| Code | Description | Export rate | Duty |
|---|---|---|---|
| 9801 00 11 | For industrial plant project | 0.5% | 7.5% |
| 9801 00 12 | For irrigation plant | 0.5% | 7.5% |
| 9801 00 13 | For power project, other than solar power plant or solar power project | 0.5% | 7.5% |
| 9801 00 15 | Project for exploration of oil or other minerals | 0.5% | 7.5% |
| 9801 00 19 | For other projects, other than solar power plant or solar power project | 0.5% | 7.5% |
| 9801 00 20 | Components (whether or not finished or not) or raw materials for the manufacture of aforesaid items required for the initial setting up of a unit or the substantial expansion of a unit | 0.5% | 7.5% |
| 9801 00 30 | Spare parts and other raw materials (including semi-finished materials or consumable stores for the maintenance of plant or project | 0.5% | 7.5% |
| Level | Description |
|---|---|
| 98 | Project imports; laboratory chemicals; passengers' baggage, personal importations by air or post; ship stores |
| 9801 | All items of machinery including prime movers, instruments, apparatus and appliances |
| 9801 00 14 | For mining project (kg.) |
9801 00 14 at its First Schedule rate, no exemption applied; IGST per CBIC 009/2025, II635. How these are checked.
| Rate | Levy | Amount |
|---|---|---|
| 7.5% | Basic customs duty | ₹75,000 |
| 10% | Social Welfare Surcharge | ₹7,500 |
| 18% | IGST | ₹1,94,850 |
| 27.74% | Total | ₹2,77,350 |